Wednesday, March 13, 2019

Conservation of Water in Nagaland

94% of the entirety atomic number 18a of Nagaland is hilly terrain with heavy annual rainfall ranging from 120cm to 240cm As proposed in the 4th Plan, 3 (three) Watershed Pilot Projects have been demarcated i. e. , at Zubza in Kohima District, at Tuli in Mokokchung District and at Chare in Tuensang District by the end of 1972-73, where field works on various aspects of Soil preservation viz. , terracing, Contour bunding, Afforestation, Orchard Plantation and construction of irrigation channels are in full swing in all the above Projects.The division has 14 (fourteen) meteorological observatories spread all over the state, which has been sum uping and provide the met. data to various land users departments as well as providing the occasional weather bulletin in media viz. , Radio, T. V. , and News papers. Augmentation of Water cut to Kohima Town by Gravity flow from Dzukou and Dzuna river. A Survey has been conducted to grow out the possibility of tapping water system from Dzun a Rivers and has been found to be feasible. This Project envisages for a 975 million litre capacity Balancing Reservoir to store the waste monsoon run-off water from Dzuna river.This will, to a large extent supplement the deficiency during take to the woods season. The estimated honk follow is Rs. 33. 97 crore at 2003 price levels. The visualize has been authorize and sanctioned recently by the Urban Development Ministry. ) Augmentation of Water generate to Mokokchung Town Due to problems faced by the present water supplement system by pumping from Dikhu River to Mokokchung Town, a project to augment water supply to Mokokchung town by Gravity from Tichipami source with an estimated damage of Rs. 1000. 3 lakhs has been taken up. A budget provision of Rs. 192. 00 lakhs under Negotiated Loan (HUDCO) is ear marked during 2002 03. Anticipated use of goods and services up to 31/3/2003 is Rs. 800. 00 lakhs and is anticipated to be completed and commissioned by June/2004. i) Au gmentation of Water Supply to Mon Town - The project has been sanctioned at an estimated cost of Rs. 653. 00 lakhs. The expenditure up to March 2003 is Rs. 569. 901 lakhs. The project has been completed and is expected to be inaugurated shortly.The scheme will deliver purified water at the rate of 60 litres per capita per day (lpcd) for a design cosmos of 13000. ii) Augmentation of Water Supply to Zunheboto Town The project has been sanctioned at an estimated cost of Rs. 959. 00 lakhs. Budget provision kept for the year 2002 03 is Rs. 30. 00 lakhs under AUWSP. The anticipated expenditure up to March 2003 is Rs. 904. 00 lakhs The project was commissioned on 18th whitethorn/2001. The Scheme is designed to deliver purified water at the rate of 70 litres per capita per day to a nation of 17,800.Extension of distribution lines and introduction of metering system is in progress. (iii) Augmentation of Water Supply to Wokha Town This project has been sanctioned at an estimated cost of R s. 351. 30 lakhs. Budget provision during 2002 03 is Rs. 0. 22 lakhs. The anticipated expenditure up to March 2003 is Rs. 189. 47 lakhs The project is expected to be completed by March/2005. Once completed, the Scheme can deliver purified water at the rate of 50 litres per capita per day (lpcd) to a total design population of 20,000.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.